INSTALLATION STEPS
With base installation, waterproofing and tiling, a fully frameless shower can be completed in hours.
Printable PDF version: Linea Quattro Installation Overview
![]() |
|
![]() |
![]() |
| 1. Existing timber floor | 2. Flooring from the shower are removed. Plumbing set up for the correct waste position. | 3. Extra blocking added between floor joists. | 4. Additional flooring added to create a recessed platform for the base to sit on. |
![]() |
|
|
![]() |
| 5. Shower base fitted using the supplied construction adhesive. | 6. Waste fitting top connected. Shower walls lined to finish flush with the shower base upstand. | 7. Membrane connection strips applied to where the base connects with the floor and walls. | 8. Shower base adhesion layer applied. |
![]() |
![]() |
![]() |
![]() |
| 9. Walls and floor waterproofed using your preferred liquid waterproofing method. | 10. Wall glazing channels fitted directly onto the waterproof membrane, interlocking with the factory-sealed base glazing channels. | 11. Shower / bathroom tiled. Tapware installed. | 12. Atlantis 2120mm frameless glass screens installed. Linea Quattro watertight shower is complete. |