INSTALLATION STEPS

With base installation, waterproofing and tiling, a fully frameless shower can be completed in hours.

Printable PDF version: Linea Quattro Installation Overview

 
1. Existing timber floor 2. Flooring from the shower are removed. Plumbing set up for the correct waste position. 3. Extra blocking added between floor joists. 4. Additional flooring added to create a recessed platform for the base to sit on.
     
5. Shower base fitted using the supplied construction adhesive. 6. Waste fitting top connected. Shower walls lined to finish flush with the shower base upstand. 7. Membrane connection strips applied to where the base connects with the floor and walls. 8. Shower base adhesion layer applied. 
       
 9. Walls and floor waterproofed using your preferred liquid waterproofing method. 10. Wall glazing channels fitted directly onto the waterproof membrane, interlocking with the factory-sealed base glazing channels.  11. Shower / bathroom tiled. Tapware installed.  12. Atlantis 2120mm frameless glass screens installed. Linea Quattro watertight shower is complete.