
Request Brochure
Click Here
Level-entry Base and Waste
Detailed installation instructions are included with each system component when purchased. | ||||||
| | | | | |||
| step 1: Connect waste at centre position (plumber). | | step 2: create sub-floor at level of joists | | |||
| | | | | |||
| step 3: apply adhesive to base underside. | step 4: fit base flat onto sub-floor. | |||||
| | | | | |||
| step 5: screw down top- side of waste. | step 6: screw down base perimeter/flange onto floor using fixing holes. | |||||
NEXT STEP: Finish preparation of walls and floor.
